A1 Great Northway Bridge
A1 Great Northway Bridges
As part of the replacement of edge beams on the existing bridge carrying the A1 across a river, Intaspan were commissioned to design, fabricate and erect two temporary foot and services bridges to divert the footpath and services from the existing bridge.
The new structures consist of a 28m and a 14m span steel bridge with timber decks on either side of the existing bridge. Installation required a road closure, so the bridges were installed on a Saturday to minimise disruption.
View the embedded image gallery online at:
http://topbond.co.uk/highway-structures/a1-great-northway-bridge/menu-id-11.html#sigProId556a406130
http://topbond.co.uk/highway-structures/a1-great-northway-bridge/menu-id-11.html#sigProId556a406130